Menu

1980

In order to receive bulk clay from the United States, Oil-Dri, S.A. built a plant on the Rhine River in Cologne, Germany. The plant repackaged the material as cat litter and floor absorbent.

Stay Connected
Creating Value From Sorbent Minerals

© 2024 Oil-Dri Corporation of America. All Rights Reserved.